File #: 19-1106-1113    Name:
Type: Action Item Status: Passed
File created: 10/31/2019 In control: Board of Commissioners
On agenda: 11/13/2019 Final action: 11/13/2019
Title: CHANGE ORDER NO. 01: NTE $211,000.00 GATELY PARK INDOOR TRACK & FIELD FACILITY CONSTRUCTION MCHUGH BOWA GATELY PARK JOINT VENTURE, LLC SPECIFICATION NO. P-18011
Attachments: 1. McHugh Bowa MWBE
TITLE
CHANGE ORDER NO. 01: NTE $211,000.00
GATELY PARK INDOOR TRACK & FIELD FACILITY CONSTRUCTION MCHUGH BOWA GATELY PARK JOINT VENTURE, LLC
SPECIFICATION NO. P-18011

BODY

To the Honorable Board of Commissioners of the Chicago Park District

I. Recommendation

It is recommended that a change order be approved affecting the contract for the subject work; said change to authorize:

Change Order #01: Construction scope of work changes associated with the After School Matters program spaces.
ADD: Not-to-Exceed $211,000.00

II. Change Order Information

Contractor: McHugh Bowa Gately Park Joint Venture, LLC
Corporation Trust Center
1209 Orange Street
Wilmington, Delaware 19801



MBE%
WBE%
Original Contract Amount :
$53,521,308.00
33.59
5.52
Previous Change Orders :
$ 0.00
-
-
Contract Amount prior to this Change Order:
$53,521,308.00
37.89
8.71
Amount of Current Change Order:
$211,000.00 (0.39%)
43.29
0.25
New Contract Amount:
$53,732,308.00
37.97
8.67


Contract Type: Construction Contract

Contract Period: Contract time will remain the same

Contract Amount: Not-to-Exceed $53,732,308.00

The Contractor will maintain the minimum 25.00% MBE and 5.00% WBE compliance on this contract.

Change Order #01: After School Matters (ASM) requested these revisions to better align with their programming needs and has approved funding the expenditure for additional construction services. These are costs associated with the revisions to the scope of work in the After School Matters space within Gately Indoor Track & Field Facility including Architectural, Mechanical, Plumbing, Electrical and Low Voltage system revisions.

The Scope of work includes: Revised layout of the Music Room adding additional acoustical walls for a Practice Room and Mixing Studio. Incorporated projector rough-ins, wireless access points and overhead power reels to several of the program rooms. Added casework and countertops in the Classrooms, Computer Labs and Art R...